Why is using copy and paste for version control a bad idea? začať sa učiť
|
|
|
|
|
what is a version control system? začať sa učiť
|
|
A version control system (also known as a Revision Control System) is a repository of files, often the files for the source code of computer programs, with monitored access
|
|
|
describe Local version control system LCVS začať sa učiť
|
|
Version control database for a single developer local database or small server
|
|
|
describe central version control system začať sa učiť
|
|
A server with the versions saved documented changes accessable for multiple people downloading the file as needed to make changes
|
|
|
What is the key disadvantages of CVCS začať sa učiť
|
|
single point of failure if the server is down nobody can work, if the server is corrupted then all the work is gone
|
|
|
Describe Distributed Version Control System začať sa učiť
|
|
simmilar to centralised except that the whole repository is downloaded when a user downloads to create changes this creates back ups
|
|
|
What are the 3 stages of a file? začať sa učiť
|
|
Committed, modified, staged.
|
|
|
začať sa učiť
|
|
the file is safely stored in the database
|
|
|
začať sa učiť
|
|
the file has been mofidied, but it has not yet been committed
|
|
|
začať sa učiť
|
|
the file has been modified file and marked to go into the next commit snapshot
|
|
|
The staging area is local true or false? začať sa učiť
|
|
|
|
|
začať sa učiť
|
|
snapshot version indicates a view of the source code taken at a specific time. This is not necessarily stable or ready for full use and can be changed in the future, as opposed to a release version which is stable and should be final.
|
|
|
what is a basic git work flow? začať sa učiť
|
|
1. Modify files in the working directory2. Stage the files by adding their snapshots to the staging area3. Commit: takes files from the staging area and stores their snapshots to the Gitdirectory
|
|
|
what is Software Configuration Management začať sa učiť
|
|
A set of disciplines and techniques of initiating, evaluating, and controlling changes to software products
|
|
|
describe Configuration item identification začať sa učiť
|
|
the fundamental structural unit of a configuration management system. Examples of CIs include individual requirements documents, software, models, and plans.
|
|
|
what is Promotion management začať sa učiť
|
|
Developing versions for use by other developers eg testing branch
|
|
|
What is Release management začať sa učiť
|
|
Developing versions for release to the customer
|
|
|
What is Change management začať sa učiť
|
|
|
|
|
začať sa učiť
|
|
Managaing the development of concurrent branches
|
|
|
Name 4 Configuration Management Roles začať sa učiť
|
|
Configuration manager, Change control board manager, Developer, Auditor
|
|
|
explain Configuration manager začať sa učiť
|
|
Identifies configuration items
|
|
|
explain Change control board manager začať sa učiť
|
|
Approves/rejects change requests
|
|
|
začať sa učiť
|
|
Checks in changes and resolves conflicts
|
|
|
začať sa učiť
|
|
Ensures the consistency and completeness of the release
|
|
|
Define configuration item začať sa učiť
|
|
An aggregation of hardware, software, or both, that is designated for configuration management and treated as a single entity in the configuration management process
|
|
|
začať sa učiť
|
|
A specification or product that has been formally reviewed and agreed to by responsible management, that thereafter serves as the basis for further development, and can be changed only through formal change control procedures”
|
|
|
začať sa učiť
|
|
The initial release or re-release of a configuration item associated with a complete compilation or recompilation of the item
|
|
|
začať sa učiť
|
|
Change to a version that only corrects errors in the design/code; does not change functionality
|
|
|
začať sa učiť
|
|
The formal distribution of an approved version
|
|
|
name some examples of Configuration Items začať sa učiť
|
|
}Problem statement} Software project management plan} Requirements analysis document} System design document} Project agreement} Object design document} Dynamic model} Object model} Functional model} Unit tests} Integration test strategy} Source code}...
|
|
|
Give examples of Baseline začať sa učiť
|
|
}First prototype of the system is implemented and tested} All data access methods are implemented and tested} The GUI is implemented
|
|
|
Explain the Naming Schemes for Baselines začať sa učiť
|
|
7.4.2 Major(External release). Minor(Internal release). Small revision(Developer)
|
|
|
What is Change Management začať sa učiť
|
|
Handling of change requests
|
|
|
What is the process for Change Management začať sa učiť
|
|
Change is requested} Change requested is assessed against requirements and constraints} Change requests is either accepted or rejected} If accepted, it is assigned to a developer and implemented} Implementation change is audited
|
|
|
what are the Ty p e s o f C o n t r o l l i n g C h a n g e s začať sa učiť
|
|
|
|
|
explain propmotion controll začať sa učiť
|
|
The internal development state of a software is changed
|
|
|
začať sa učiť
|
|
A changed software system is made visible outside the development organization
|
|
|
When does Software configuration management planning start d začať sa učiť
|
|
during the early phases of a project
|
|
|
What is the outcome of SCM planning začať sa učiť
|
|
the Software Configuration Management Plan
|
|
|
What are the 6 sections of an SCM PLan začať sa učiť
|
|
Introduction, SCM management (WHO?), SCM activities (WHAT?), SCM schedule (WHEN?), SCM resources (HOW?), SCM plan maintenance
|
|
|
Explain SCM plan introduction začať sa učiť
|
|
Describes the Plan’s purpose, scope of application, key terms, and references
|
|
|
Explan SCM plan managment začať sa učiť
|
|
Identifies the responsibilities and authorities for managing and accomplishing the planned SCM activities
|
|
|
explain SCM plan activities začať sa učiť
|
|
dentifies all activities to be performed in applying to the project
|
|
|
Explain SCM plan schedule začať sa učiť
|
|
Establishes required coordination of SCM activities with other activities in the projec
|
|
|
Explain SCM plan resources začať sa učiť
|
|
Identifies tools and physical and human resources required for the execution of the Plan
|
|
|
Explain SCM plan maintenance začať sa učiť
|
|
identifies how the Plan will be kept current while in effect
|
|
|